Termite control · Hyderabad & Secunderabad
Anti-Termite Treatment in Hyderabad: Pre-Construction, Pipeline and Post-Construction Guide

Termites (white ants, or chedalu) are one of the most expensive pest problems for homes and buildings in Hyderabad and Secunderabad. They work out of sight — inside door frames, wardrobes, skirting and wooden flooring — and by the time you see mud tubes on a wall, the colony has usually been feeding for months.
This guide explains the three main kinds of anti-termite treatment we carry out — pre-construction soil treatment, the anti-termite pipeline (reticulation) system, and post-construction drill-fill-seal — so you can choose the right one for a new building, a flat or an old house.
Why termites are such a problem in Hyderabad
Subterranean termites live in the soil and travel up into buildings through tiny cracks in the floor, wall joints, pipe openings and expansion gaps. The black and red soils around Hyderabad hold moisture well, and the first monsoon rains each year trigger swarms of winged termites (alates) that look for new places to start colonies.
New construction is especially at risk: fresh soil fill, wooden shuttering left in the ground and gaps around plumbing all give termites an easy path in. In older buildings in areas such as the old city, Secunderabad cantonment, Kukatpally or Dilsukhnagar, termites often enter through cracks that open up as the structure ages.
Common signs of termites
- Mud tubes (thin tunnels of soil) on walls, foundations or behind cupboards
- Hollow-sounding door frames, skirting or furniture
- Small piles of wings near windows or lights after the first rains
- Bubbling paint, sagging wooden flooring or doors that suddenly stick
Pre-construction anti-termite treatment (for new buildings)
Pre-construction treatment creates a chemical barrier in the soil before the building is finished. It is done in stages as construction moves forward — the foundation pits, the backfill around the foundation, the plinth filling and the soil under the floor before the flooring is laid — and along the outside of the walls once they are up.
Because each stage has to be treated before it is covered, timing matters. Builders and house owners usually call us when excavation starts, so the visits can be planned with the site schedule. Read more on our anti-termite treatment for construction in Hyderabad page.
The anti-termite pipeline (reticulation) system
A pipeline system is installed during construction, before the flooring is done. Anti-termite pipes are clipped along the inner walls at plinth level and run across the floor, and the pipe ends are brought out to injection points. Once the floor is laid, the pipes are hidden — but the soil under your floor can still be treated later by pumping termiticide in through the injection points, without breaking new tiles.
This is useful for homes and commercial buildings where the owner wants an easy way to top up protection in future years. The clips below are from pipeline jobs carried out by our team.
Anti-termite pipeline laid around the rooms before flooring Pipeline network across the floor slab Pipe fixed along the inner wall at plinth level
Post-construction treatment: drill-fill-seal (for existing homes)
If termites are already in a finished flat, house or office, we use the drill-fill-seal method. Small holes are drilled at intervals along the joint where the floor meets the walls, around door frames and at other entry points. Termiticide is injected into the holes so it reaches the soil below, and the holes are then sealed with a matching filler.
Affected woodwork such as door frames, wardrobes and kitchen cabinets is treated as well, and we point out moisture problems — leaking pipes, damp walls — that attract termites back. See termite control in Hyderabad or termite control in Secunderabad for what is included.
Treatment points along the wall and floor joint Anti-termite work under a kitchen counter
Which treatment do you need?
The price depends on the built-up area, the stage of construction, how many floors are in contact with soil and how far an infestation has spread. That is why we inspect first and confirm the price with you before any work begins.
| Your situation | Suggested treatment |
|---|---|
| Open plot or foundation work starting | Pre-construction soil treatment, stage by stage |
| New building, flooring not laid yet | Pre-construction treatment, with an optional pipeline system |
| Finished flat, house or office with termites | Drill-fill-seal plus treatment of affected woodwork |
| Termites in one cupboard or door frame | Inspection first — the colony is usually bigger than it looks |
How to prepare for a termite treatment
- Clear the area along walls and inside the affected wardrobes or cupboards
- Do not spray store-bought insecticide on mud tubes — it scatters the termites
- Tell us about recent plumbing leaks or damp walls
- Keep children and pets away from treated areas until the technician says they can return

